Skip to content

Importing electrical equipment into Tunisia

Importing electrical equipment

Components for factories, equipment for the Tunisian market

Tunisia imported 3.4 billion dollars of electrical equipment in 2024, above all from China, France and Germany: protection equipment, insulated wire and telephones. Components for a production line and finished goods for the shops follow different rules at import, and that difference decides whether the goods go through technical control.

The product in figures

Imports 2024
3.4 billion $
Main suppliers
China, France, Germany
Largest import lines
Protection equipment (637 M$), insulated wire (536 M$), telephones (326 M$)
The rule to know
Many electrical goods for the Tunisian market are on the technical control lists at import; components imported for your own production are exempt.

Figures: CEPII BACI 2024, through OEC. Rules: WTO Trade Policy Review of Tunisia 2025 (WT/TPR/S/479) and the texts named on this page. Rules change; we check them for each shipment.

Points to watch

Technical control

Finished goods for sale in Tunisia may need a technical control file. Lodge it on TTN before the goods arrive, so the container does not wait.

Batteries

Products with lithium batteries travel as dangerous goods. We need the safety data sheet and the battery details before booking.

Value and insurance

Electronics are light and valuable; a carrier's liability, limited by weight, rarely covers them. Insure the full value.

Documents and steps

Importing electrical equipment into Tunisia

Importing into Tunisia, step by step

  1. Agree the Incoterm with your supplier: with FOB or FCA you choose the forwarder and see the freight cost; with CFR or CIF the supplier's choice decides it. See Incoterms 2020.
  2. Find the tariff line (HS code) of the product before you order: it sets the duties and taxes and shows whether a control applies.
  3. Components for your own production are exempt from technical control; finished goods for the Tunisian market may be checked.
  4. Before you pay: give the Ministry of Commerce the prior information on the purchase, then domicile the operation at your bank.
  5. Collect the documents: commercial invoice, packing list, transport document and the proof of origin, plus any certificate the product needs.
  6. Get copies of the documents before the goods leave: we check that the invoice, the packing list and the transport document match, the most common cause of delays. See 10 mistakes that hold a container at Radès.
  7. Customs declaration, payment of duties and taxes, and release at Radès, Sfax or the airport; then delivery to you. See how import duties are calculated.
  8. Plan the collection: the free days at the port are limited, after that demurrage and storage are charged. See Demurrage and detention.

Sources: WT/TPR/S/479, Directive 2014/35/EU, Directive 2011/65/EU.

From the factory in Asia to your shelf

Importing electrical equipment into Tunisia

Most electrical goods come from China, with France and Germany next. We book the container from the supplier's port, follow it to Radès or Sfax, clear customs and deliver to you, with each fee in the quote. See what makes up the price of a container from China.

The paperwork decides how fast a container leaves the port: technical control where it applies, the prior information to the Ministry of Commerce, and documents that match each other. We check them before the goods leave.

What we take care of

  • Collection from suppliers in China and Europe
  • Several suppliers combined into one container
  • Technical control files prepared with you
  • Import customs clearance at Radès, Sfax or the airport
  • Delivery to your warehouse or plant
  • Cargo insurance on request

Questions importers of electrical goods ask

Does my product need technical control?

Finished electrical goods for the Tunisian market often do; components for your own production are exempt. Send us the product list and we check the tariff lines.

Yes. We collect from several suppliers and ship one container. See Freight consolidation.

On the customs value, the tariff line and the origin. See Import duties in Tunisia.

Sea for regular volumes; air for urgent components when a line is waiting. See Air, ocean or road.

Request a quote for electrical imports

Tell us the products, the supplier and the volume

We reply with a price that includes every fee. Prefer to talk? Call us on +216 70 295 255 or write to info@kyranislogistics.com.

    We reply within one working day, with every fee included.